Zheng Zhou Li Zhao Electric Furnace Co., Ltd.  |  sales@furnacecopperparts.com
English ▾
Home  /  Blog  /  Company

OEM Water-Cooled Furnace Cable: From Drawing to Production

Company Published 9 August 2026 1 min read 34 views
OEM Water-Cooled Furnace Cable: From Drawing to Production

For industrial furnace cable projects, a reliable OEM process starts before production. The objective is to make sure the final cable matches the customer's electrical system, mechanical installation and cooling arrangement.

From drawing review to production

Step 1: Technical information The customer provides furnace type, power, frequency, current, cable quantity and application conditions.

Step 2: Existing cable or drawing For replacement projects, photographs and dimensions of the existing cable are highly valuable. For new projects, a customer drawing can define the terminal and installation requirements.

Step 3: Technical confirmation The supplier reviews conductor cross-section, cable length, terminal geometry, water connections and construction.

Step 4: Drawing confirmation For customized assemblies, the proposed dimensions should be confirmed before production.

OEM Water-Cooled Furnace Cable: From Drawing to Production
Zheng Zhou Li Zhao — furnace copper parts made in our own plant.

Approval, testing and shipment

Step 5: Manufacturing The cable assembly is produced according to the approved specification. Construction may include flexible copper strands, protective surface treatment, cooling-water passages, outer hose and customized terminals.

Step 6: Inspection and testing The finished cable should be inspected against the agreed dimensions and applicable electrical/hydraulic requirements.

Step 7: Packing and shipment The cable is protected for transport and packed according to the agreed shipping requirements.

This process is especially important for replacement cables because a small terminal-dimension difference can create installation problems even when the conductor size is correct.

For buyers who need an urgent quotation, the fastest way to start is to send:

  1. Existing cable photos
  2. Terminal photos
  3. Cable length
  4. Conductor cross-section
  5. Furnace type
  6. Current/frequency
  7. Quantity
  8. Delivery destination

How we can help

Zheng Zhou Li Zhao Electric Furnace Co., Ltd. can then review the information and prepare a technical quotation for the customer's project.

Send your cable drawing, photos, dimensions or furnace specifications for technical confirmation and a quotation — normally within 24 hours. Get a quote

Related articles

← All articles